Project in Progress

Projects in Progress

Someday soon you will be able to visit your dream home under construction. Until then, take a look at some of our other clients' log homes and timber homes in progress.

Abbreviations used: ICF (Insulated Concrete Forms), SIP (Structural Insulated Panels)

Location: Maryland

Structural Shell: ICFs, Timber Frame, SIP Walls & Roof

The first layer of ICFs are installed as part of the basement wall that borders the slope.

Project in Progress 1

Basement floor is poured, and the ICF basement walls are filled and ready for the next stages.

Project in Progress 2

Timber frame is installed by PrecisionCraft crews.

Project in Progress 3

SIP Walls (pre-cut for windows and doors) are installed with help from an on-site Technical Assistant.

Project in Progress 4

Location: Colorado

Structural Shell: ICFs, Timber Frame, SIP Walls & Roof

Basement ICF walls are constructed and support the main-level floor joists which are ready for the main floor deck to be installed.

Project in Progress 1

Timber framing is installed, including the timber staircase.

Project in Progress 2

Timbers are stained; SIP walls and roof are installed around the frame.

Project in Progress 3

Windows are next to get placed, while work continues on the rear wrap-around deck.

Project in Progress 4

Location: British Columbia

Structural Shell: ICFs, Log Post & Beam, SIP Walls & Roof

ICFs arrive and are stacked on the foundation footing, in preparation for the pour.

Project in Progress 1

A pre-cut and pre-fit log truss is re-assembled on the site and raised onto the floor deck.

Project in Progress 2

SIP walls and roof are installed with assistance from a PrecisionCraft technical advisor.

Project in Progress 3

Windows, stone, and roofing materials are added.

Project in Progress 4

Location: Nebraska

Structural Shell: ICFs, Timber Frame, SIP Walls & Roof

A modern-style timber truss flies in for placement on the pillars located on the back elevation.

Project in Progress 1

The slope of the lot was used to create split levels of exterior living spaces.

Project in Progress 2

SIP walls and roof combine with windows to finish the dry-in stage of the construction.

Project in Progress 3

As construction nears its end, the final exterior cladding, including stone and wood siding, are installed.

Project in Progress 4

Location: Wyoming

Structural Shell: ICFs, Timber Frame, Milled Log Walls, SIP Roof

Timber frame bents are fit, connected, and installed efficiently by one of PrecisionCraft's expert teams.

Project in Progress 1

Square log walls are installed, as well as the timber frame elements that connect with those walls.

Project in Progress 2

SIP roofing is installed within a couple of days.

Project in Progress 3

The house starts to really come to life when stain is applied to the wood and finishes are installed.